How to Read a Metal Roofing Company Proposal

image

image

A solid metal roof can outlast asphalt by decades, resist wind and fire, and often lower cooling costs. The roof itself is only half the story. The other half lives in a document most homeowners and facility managers skim too quickly: the proposal. Decisions you make at this stage determine the roof you get, the price you pay, and how well the system performs when the next hailstorm or heat wave rolls through.

I have spent enough time on job walks and attic ladders to know where proposals shine and where they hide gaps. What follows is a practical tour of the pages you are likely to receive from a metal roofing company, with plain‑spoken guidance on what to confirm, what to question, and what to insist be put in writing. It applies to both residential metal roofing and commercial metal roofing, whether you are replacing a tired shingle roof, commissioning a new metal roof installation, or planning a targeted metal roof repair.

Start with scope, not price

Open the proposal and resist the urge to jump to the number. Read the scope first. Good metal roofing contractors describe not just what they will do, but how, with which materials, and under what conditions. Look for clarity on roof area, system type, panel profile, fastener method, underlayment, insulation, flashing details, ventilation, and how penetrations will be handled.

I still remember a school reroof where two bids were $80,000 apart. The lower number assumed a basic exposed‑fastener agricultural panel, minimal underlayment, and no allowance for rooftop units. The higher bid specified a structural standing seam system with factory‑applied sealant, high‑temp underlayment, and new curbs for the HVAC. The delta wasn’t a mystery once we compared scope line by line.

Know your panel system

Metal roof performance starts with panel geometry, thickness, and how the panels connect.

Exposed‑fastener panels are common on outbuildings and some residences. They install quickly and can be terrific for cost‑sensitive projects. The trade‑offs are more penetrations through the panel and visible screws with neoprene washers that can age and require maintenance. Typical panel widths run 36 inches with rib heights around 3/4 inch. Steel thickness often ranges from 29 to 26 gauge, where lower numbers are thicker and stronger.

Standing seam systems hide the fasteners beneath the seams. Mechanical seam profiles, such as double‑locked 180‑degree seams, excel in high‑wind zones and on low slopes. Snap‑lock profiles install faster but want a bit more slope. Panel widths often run 12 to 18 inches with rib heights from 1 to 2 inches. Thicker steel or aluminum improves dent resistance and screw‑pullout values, especially around edges and corners.

Make sure the proposal names the exact profile, gauge, and material. “Standing seam metal” is not a specification. A clear line might read 24‑gauge Galvalume steel, 16‑inch panel, 1.75‑inch mechanically seamed rib, striations for oil can relief. If the proposal uses brand or series names, ask for the data sheet and confirm it matches what is being quoted.

Material choices and their trade‑offs

Steel is the workhorse. Galvanized uses a zinc coating to protect from corrosion. Galvalume blends aluminum and zinc, which often holds up better in many environments, particularly away from coastal salt spray. If you are near the ocean, ask for aluminum. It costs more, but it will not rust and handles salt air more gracefully. Copper and zinc belong in the premium category and require experienced installers.

Paint finish matters almost as much as the metal. SMP (silicone‑modified polyester) coatings are common and budget friendly. Kynar 500 or PVDF finishes cost more but resist chalk and fade better, especially in strong sun. Proposals should list the paint system brand and warranty terms.

Gauge shows up as a number but holds real‑world weight. A 24‑gauge steel panel is roughly 50 percent heavier and stiffer than 29‑gauge. On residential metal roofing, 26‑gauge is the thin end I am comfortable with for exposed‑fastener and light duty. For standing seam roofs in storm zones or on commercial buildings, 24‑gauge is a safer baseline.

Underlayment, substrates, and thermal layers

What lives under the metal governs how the system handles heat, moisture, and fire. Felt is not enough for most projects anymore. A synthetic underlayment rated for high temperatures won’t sag, tear as easily, or bond to metal in summer heat. On low‑slope applications or in hot climates, a high‑temp, self‑adhered membrane earns its keep around eaves, valleys, and penetrations.

If you are installing over solid decking, confirm the type and condition of the deck. A re‑roof on 3/8‑inch plywood with soft spots is an invitation to oil canning and fastener issues. On open framing, structural panels rated for spanning and wind uplift may be specified, or the proposal should include new purlins or retrofits.

Insulation should be described clearly. Above‑deck rigid foam can create a continuous thermal break but affects fastener length, panel clip height, and flashing details. Below‑deck batt or blown‑in insulation interacts with ventilation. Make sure the proposal ties together insulation, ventilation, and condensation control. I have seen pristine metal panels ruined on the underside by condensation dripping for a single season due to poor airflow.

Ventilation and moisture management

Metal does not breathe, so the assembly must. Look for ridge vents, soffit vents, or a cold roof layer created by vented battens. On low‑slope commercial roofs with standing seam, the design might rely more on air and vapor control below the deck. The proposal should specify whether a vapor retarder will be installed and where it sits in the assembly.

In snowy regions, ice dam control demands attention at eaves. That means self‑adhered underlayment a minimum of 24 inches inside the warm wall in many codes, tall end dams at eaves, and properly sized gutters or snow retention devices if needed. If you have solar panels or plan to add them, ask about integrating snow retention and conduit penetrations now, not after the roof is complete.

Flashings, trims, and penetrations decide longevity

Corners and holes are where roofs fail. A well‑written proposal outlines how valleys, hips, ridges, eaves, gables, and sidewalls will be flashed. It should list the gauge and finish of trims, whether they are site‑formed or factory‑made, and how they fasten. I prefer hemmed edges at eaves and gables with concealed cleats rather than face screws into thin metal. Ask for continuous cleats in high‑wind areas, not intermittent clips.

Penetrations deserve their own paragraph. Skylights, vents, chimneys, stoves, and HVAC stands all require curb details at least as robust as the field panels. On standing seam, boots that clamp to the ribs without piercing panels can save headaches. For commercial metal roofing, specify curb heights and cricket details behind large units. If your proposal simply says flash penetrations as needed, push for drawings or manufacturer standard details to be attached.

Structural checks and code compliance

Metal roof replacement on older properties often reveals structural surprises. A thorough proposal will note whether the contractor has verified framing size and spacing, deck thickness, and the presence of rot or insect damage. In hurricane or high‑wind regions, uplift requirements affect clip spacing and fastener types. For schools, hospitals, or assembly spaces, fire ratings and assembly approvals might be mandatory.

Permitting should be addressed. The proposal should state who will obtain the permit, pay fees, arrange inspections, and handle engineering letters if needed. If the project requires stamped drawings for a new metal roof installation, that cost and responsibility should be explicit.

Warranties that mean something

Roof warranties come in layers. The panel manufacturer offers a finish warranty that typically covers chalk and fade for 20 to 40 years depending on the paint system and color. There may also be a substrate warranty against perforation due to corrosion. Read the fine print. Proximity to salt water, animal waste exposure, or contact with dissimilar metals can void coverage.

The metal roofing company provides a workmanship warranty. This is the promise that seams will not open, flashings will not fail, and leaks tied to installation will be remedied. Common ranges are 2 to 10 years. I value longer craftsmanship warranties, but only when the contractor’s track record suggests they will be around to honor it. Ask for references five or more years old. If the proposal includes an extended or no‑dollar‑limit system warranty, check what inspections and approved details are required to keep it in force.

Safety, logistics, and site protection

Good proposals talk about people, not just products. That includes a safety plan, fall protection methods, and how the crew will protect landscaping, siding, parking areas, and interior spaces. I like to see notes on material staging, crane or lift usage, debris chutes, and daily cleanup. If the building will remain occupied, phasing and noise schedules should be spelled out. On commercial projects, make‑safe provisions for after hours need to be clear.

Waste disposal is not just a dumpster line item. Asphalt shingles weigh 200 to 400 pounds per square on average, and metal tear‑offs add up fast on big roofs. Confirm recycling plans for metal scraps and how nails, screws, and sharp offcuts will be contained. Magnetic sweeps should happen daily, not once at the end.

Pricing structure without fog

A fair price can look high or low depending on what is included. Unit pricing helps. Cost per square (100 square feet) for the field area, separate line items for tear‑off, decking repairs per sheet, new flashing packages, and penetration counts help you compare apples to apples. If a bid lumps everything into one number, you may have trouble later negotiating change orders because the baseline is murky.

Contingencies for hidden damage should be clearly written. A common approach is a set rate per linear foot of rotten fascia or per sheet of bad decking. Ask for photos of any proposed repairs before work proceeds. I also look for allowance lines for gutters, snow guards, or custom curbs if the exact quantities are unknown at proposal time.

Payment schedules should track milestones, not just dates. A reasonable pattern is deposit on contract, progress draws tied to percent complete or specific phases, and a final retainage released after punch list completion and receipt of warranties. Be wary of front‑loaded schedules that leave you exposed late in the job.

Comparing multiple proposals without losing your weekend

If you have three bids on your dining table, you will see a mix of terminology and formats. Create a quick comparison sheet for yourself and normalize key items: panel type, gauge, material, finish, underlayment type, fastener method, flashing approach, warranty terms, roof area, and price per square. Once the technical bones line up, evaluate the soft factors like communication, responsiveness, and whether the contractor actually measured your roof and looked in your attic or plenum.

The best metal roofing services are local in more than name. Local metal roofing services know the wind patterns, the building inspectors, and the quirks of regional suppliers. If two proposals look similar, I lean toward the team that can show projects in your zip code and who returns calls promptly during the courting stage. That behavior usually predicts what you will get during the job.

Special cases: overlays, recover systems, and retrofit framing

Not every metal roof replacement starts with a tear‑off. On residential roofs with a single layer of shingles in decent condition, some jurisdictions allow a metal overlay. The installer runs purlins over the shingles, then attaches panels. Done right, this can save money and time, and it reduces landfill waste. The risks include uneven substrates, fastener back‑out if purlin fastening is light, and ventilation shortfalls if soffits get blocked. Ask for a cross‑section detail in the proposal and check that the assembly meets code and manufacturer warranty terms.

Commercial recover systems often use a structural standing seam retrofit over existing low‑slope roofs. Engineers design sub‑purlins that create a new roof plane, improving drainage and eliminating messy tear‑offs. Proposals should include the engineering package, attachment schedule, and uplift calculations. These systems can shine on occupied buildings since they minimize disruption, but they require careful detailing at edges and penetrations. Budget a longer lead time for shop drawings and approvals.

Fasteners and clips are tiny, important words

You can learn a lot about a contractor’s priorities by how they describe fasteners. Stainless fasteners cost more and matter on coastal or corrosive sites. Long‑life coated screws can be a good middle ground inland. The proposal should specify screw type for substrate (wood or metal), length, head style, and washer material. For exposed‑fastener systems, color‑matched heads reduce the visual impact. For standing seam roofs, panel clips manage expansion and contraction. Fixed clips have their place on short runs or small roofs. Sliding clips belong on longer runs and temperature swing zones. If you do not see clip type and spacing listed, ask.

Sealants show up in countless details: end laps, trims, penetrations. Butyl tape and butyl tubes are the standards. Silicone has limited roles. If the proposal leans on sealant instead of mechanical laps and hemmed edges for weather protection, that is a red flag. Sealant is a belt, not the pants.

Roof geometry and oil canning

Metal wants to move with temperature. Wide flat panels can show waviness known as oil canning. It is cosmetic, not structural, but it drives some owners crazy. If a smooth look is a priority, discuss panel stiffening features like minor ribs or striations. Heavier gauge panels help, as does a very flat substrate. The proposal should state whether the installer will use striations and whether oil canning is excluded from cosmetic claims. That language shows up in many manufacturer documents, but it is better to surface the topic now.

If your roof has complex geometry with lots of hips and valleys, be ready for higher labor costs. Cutting and hemming short panel runs by hand takes time. A proposal that prices a complex roof the same as a simple gable might be underestimating or planning to simplify trims in ways you would not want.

Repair versus replacement: reading a service proposal

Metal roof repair proposals read differently from full replacements. A good metal roofing repair service will identify leak sources, not just symptoms. Expect notes about failed fasteners, deteriorated washers, seam separation, open end laps, or flashing cracks. The proposal should include photos, the scope of sealant replacement, the number of fasteners to be swapped, and any panel work such as adding stitch screws at sidelaps.

Temporary repairs have their place, especially mid‑winter or in the rainy season. Make sure any stopgap plan is labeled as such. A proposal that sells a quick caulk‑and‑go at a premium without explaining the limits is not doing you a favor. If recurring leak points suggest a broader issue, ask the contractor to price a permanent solution alongside the patch so you can decide based on cost and risk.

Scheduling, lead times, and weather windows

Metal roofing installation depends on supply chains and seasons. Custom colors or specific panel profiles may carry a lead time of 3 to 8 weeks. Specialty trims and curbs add to that. The proposal should lay out expected lead times, target start dates, and how weather impacts the schedule. Installing self‑adhered underlayment in cold weather, for example, might require primers or warm‑up techniques. Some crews are great at cold‑weather work, others are not. If your building is sensitive to noise or vibration, coordinate around business hours or school terms now.

Insurance verification and licensing

This sounds dull until it isn’t. The proposal should state that the https://manuelqont315.theglensecret.com/local-metal-roofing-services-seasonal-maintenance-plans metal roofing company is licensed in your jurisdiction and list insurance coverage, including general liability and workers’ compensation. Ask for certificates made out to you as certificate holder. On commercial projects, add required endorsements to the spec and verify them before mobilization. If the contractor uses subcontractors, the same documentation should cover them.

Change orders and documentation discipline

Changes sometimes improve projects. They also test relationships. A proposal that explains how changes will be handled, priced, and approved sets the tone. I prefer a simple form with scope description, drawings or photos if needed, a lump sum or unit price breakdown, and schedule impact notes. Verbal approvals turn into fuzzy memories when rain is coming and the crew is working long days. If a condition differs from what was assumed, such as discovering rotten decking or an unpermitted rooftop unit, the proposal should reference how that gets resolved.

Red flags that deserve a second look

Here are a few items that consistently correlate with trouble down the road:

    Vague product descriptions like “24‑gauge standing seam” without profile, clip type, finish, or manufacturer data. No mention of underlayment type, flashing details, or treatment of penetrations and transitions. A workmanship warranty shorter than 2 years or tied to conditions that are hard for an owner to meet. Payment terms that front‑load more than half the contract before significant work is complete. Refusal to provide references, insurance certificates, or manufacturer approval letters for the system being installed.

What a thorough proposal usually includes

Not every project needs every bell and whistle, but most strong proposals share a backbone of details. When I skim a document and see these elements, I typically find a disciplined team behind it.

    Roof area takeoff with diagrams, slopes, and drainage direction. Named panel system with gauge, finish, profile, and manufacturer data sheet. Underlayment specification, insulation plan, and ventilation approach. Flashing schedule for eaves, rakes, valleys, ridges, and penetrations with material gauge and fastening. Warranty terms from both manufacturer and installer, plus maintenance expectations.

Residential and commercial rhythms differ

Residential owners usually care about aesthetics, curb appeal, and keeping pets and kids safe during work. They also feel disruptions acutely. Proposals should include protection plans for gardens, patios, and attic dust control if decking work is expected. If the house has cathedral ceilings or lacks soffit ventilation, the installer should speak to moisture control and possibly suggest adding vent chutes or a vented batten layer.

Commercial clients prioritize uptime, safety compliance, and predictable schedules. Access control, fall zones, rigging plans, and coordination with other trades matter. If the roof supports mechanicals, the proposal should coordinate with HVAC subcontractors for shutdowns and curb work. For commercial metal roofing, I look for wind uplift ratings and test numbers that meet the building’s exposure category, especially near coasts and open fields.

Local knowledge pays dividends

A local metal roofing company usually has a relationship with inspectors, knows which fastener coatings last around your lakes or industrial corridors, and understands how spring pollen or fall leaves affect gutter strategies. In hail country, panel selection and insurance paperwork become part of the service. Ask potential partners how many roofs they have completed within an hour’s drive and whether they handle both metal roof installation and metal roof repair. The latter matters when a storm rolls through and you need help quickly.

Final read‑through tips before you sign

By now you have a feel for what to look for. Spend fifteen more minutes and read the proposal end to end. Confirm the names of the parties, the physical address of the property, and the legal description if required. Check that the color selections are listed as both name and code. Verify that all promised items from your conversations appear in writing. If photos or shop drawings were promised, make them attachments.

Call out any ambiguity. A small edit now prevents a large argument later. The best metal roofing contractors do not mind sharpening their documents because it makes the job smoother for everyone. When you sign with confidence, you set the tone for the project, and that tone carries into the crew’s work on your roof.

A metal roof is a system, not just a panel. Reading the proposal with a builder’s eye is the surest way to get the performance you’re paying for, whether you are commissioning a new metal roof installation, planning a metal roof replacement, or lining up a focused metal roofing repair. You will step into the job with fewer surprises, better alignment, and a roof that does what it is supposed to do every time the weather tests it.

Metal Roofing – Frequently Asked Questions


What is the biggest problem with metal roofs?


The most common problems with metal roofs include potential denting from hail or heavy impact, noise during rain without proper insulation, and higher upfront costs compared to asphalt shingles. However, when properly installed, metal roofs are highly durable and resistant to many common roofing issues.


Is it cheaper to do a metal roof or shingles?


Asphalt shingles are usually cheaper upfront, while metal roofs cost more to install. However, metal roofing lasts much longer (40–70 years) and requires less maintenance, making it more cost-effective in the long run compared to shingles, which typically last 15–25 years.


How much does a 2000 sq ft metal roof cost?


The cost of a 2000 sq ft metal roof can range from $10,000 to $34,000 depending on the type of metal (steel, aluminum, copper), the style (standing seam, corrugated), labor, and local pricing. On average, homeowners spend about $15,000–$25,000 for a 2000 sq ft metal roof installation.


How much is 1000 sq ft of metal roofing?


A 1000 sq ft metal roof typically costs between $5,000 and $17,000 installed, depending on materials and labor. Basic corrugated steel panels are more affordable, while standing seam and specialty metals like copper or zinc can significantly increase the price.


Do metal roofs leak more than shingles?


When installed correctly, metal roofs are less likely to leak than shingles. Their large panels and fewer seams create a stronger barrier against water. Most leaks in metal roofing occur due to poor installation, incorrect fasteners, or lack of maintenance around penetrations like chimneys and skylights.


How many years will a metal roof last?


A properly installed and maintained metal roof can last 40–70 years, and premium metals like copper or zinc can last over 100 years. This far outperforms asphalt shingles, which typically need replacement every 15–25 years.


Does a metal roof lower your insurance?


Yes, many insurance companies offer discounts for metal roofs because they are more resistant to fire, wind, and hail damage. The amount of savings depends on the insurer and location, but discounts of 5%–20% are common for homes with metal roofing.


Can you put metal roofing directly on shingles?


In many cases, yes — metal roofing can be installed directly over asphalt shingles if local codes allow. This saves on tear-off costs and reduces waste. However, it requires a solid decking and underlayment to prevent moisture issues and to ensure proper installation.


What color metal roof is best?


The best color depends on climate, style, and energy efficiency needs. Light colors like white, beige, or light gray reflect sunlight and reduce cooling costs, making them ideal for hot climates. Dark colors like black, dark gray, or brown enhance curb appeal but may absorb more heat. Ultimately, the best choice balances aesthetics with performance for your region.